Al-Zawrah

Design and Construction of a desalination plant in the Emirate of Ajman for the Federal Electricity & Water Authority (FEWA).

Cadagua was the main stakeholder in this contract, which with a capacity of 45,560 m3 a day supplies water to an equivalent population of 230,000 people.

The advanced pre-treatment combines dissolved air flotation technology with Ultra-filtration to ensure high-quality water for the osmosis stage.

Type of treatment

Flotation (DAF), Ultrafiltration (UF), Reverse osmosis.

Main features

Location: Ajman, Arab Emirates

Capacity: 45.500 m3/day

Year: 2016