Lyna (Olsztyn) Sludge Drying and Incineration Plant

Design and construction of the Sludge Drying and Incineration Plant at the Olsztyn WWTP.

The Plant, designed and built to treat 12,000 T/year, is one of the first facilities in Poland to incinerate only sludge from a wastewater treatment facility.

The thermal processes applied reduce the original weight of the sludge by up to ten times.

Type of treatment

Thermal Drying, Incineration

Main features

Location: Olsztyn, Poland

Equivalent population: 200.000

Capacity: 12.000 T/year

Year: 2010