El Pont de Suert

WWTP created in 1995 that manages the waste waters of the capital of the region of Alta Ribagorça.

Consisting of a pre-treatment system with rotary screens, sand and grease removal systems, bioreactor and secondary settling, it send an average of 1,000m3/day of treated water to the river Noguera Ribagorçana.

The dehydration room, refitted in 2007, makes it a complete WWTP.

Type of treatment

Biological Treatment.

Main features

Location: Catalonia, Spain

Equivalent population: 5.400

Capacity: 1.080 m3/day

Year: 1995